Translations:GanttScheduler Ändringshistorik/66/en

Från DataPolarna
Hoppa till: navigering, sök

V1.28 2012-08-17

  • Links between ointments
    • Use the link tool and draw a link from an ointment that must be broken before the ointment to be mined for. You just create links between different panels.
    • You can create links by highlighting two volleys and then right-click and select Create Link.
  • Hold down Ctrl and click on ointments to select multiple.
  • Move after ointments by calculating the plan with the button that looks like a calculator.
    • Remove a link by right clicking on it and choose delete.
  • Calculation of the length of such Fill activities
    • Create a length formula in handle length according to formulas

Conditions: [ACTIVITY] = Sand Fill

  • Duration Formula: [ACTIVITY Tonnage] / 500
    • Edit fill activities tonnage of properties for this task when the length to be calculated.
  • Locking the activities from being moved by shoving etc.
    • Right-click the task and select "Lock the Move"
  • Other bug fixes