Translations:GanttScheduler Ändringshistorik/66/en
Från DataPolarna
V1.28 2012-08-17
- Links between ointments
- Use the link tool and draw a link from an ointment that must be broken before the ointment to be mined for. You just create links between different panels.
- You can create links by highlighting two volleys and then right-click and select Create Link.
- Hold down Ctrl and click on ointments to select multiple.
- Move after ointments by calculating the plan with the button that looks like a calculator.
- Remove a link by right clicking on it and choose delete.
- Calculation of the length of such Fill activities
- Create a length formula in handle length according to formulas
Conditions: [ACTIVITY] = Sand Fill
- Duration Formula: [ACTIVITY Tonnage] / 500
- Edit fill activities tonnage of properties for this task when the length to be calculated.
- Locking the activities from being moved by shoving etc.
- Right-click the task and select "Lock the Move"
- Other bug fixes