V1.44 2013-07-01
- You can enter tons in the reporting format for loading. This requires specifying a formula for calculating the tone based on load and quality.
- Transport of materials can be tracked from origin to destination final destination, a mixed content calculated if you load from several volleys into the same heap. Data stored in tables GSDestinationBatch and GSDestinationBatchContent.
- You must now use the publish plan when making new plans. This is so that all mines using the software on the same so that the same reports to work at all mines.
- Messages can instantly remove the ganttscheduler by right-clicking on the yellow line under the heading and select "Sign and delete message".
- You can set a custom color at an end.
- You can assign automatically based on activity cycle blast properties. It makes formulas in this edit / activity types and resources. Under the tab activity cycles so you put up lines for automatic assignment of activity cycles. Then you can choose to assign automatically when you right-click an ointment.
- You can set heading type on a heading. Right-click on the heading and select change heading type. The field that is modified is FACETYPE. Kristineberg and Garpenberg use it to specify the shift team to handle end.
- Large-scale mining. Activities can have tone, volume and drilling. They are allocated based on a formula of the type of activity or activity cycle. If it reports a part of a task, the new part is created with time remaining for the large-scale operation. A length formula requires that returns the remaining time left in the day.
- Destinations can be named when they are editing their balance.
- You can move the current / reporting activities. You get a question that you need to confirm that it will be moved.
- Plan to compare can be loaded directly when starting the program.
- You can add the username of the running on a shared computer. New messages are tied to the name chosen at startup.
- End caps are removed from Minemap removed from GanttScheduler plan when you press the "+" button to add new panels. End caps are started and has reported activities are not removed from the plan, these can unfortunately make it impossible to add a new heading named exactly the same as the removed.
- You will be asked if you want to start a salve on startup / reports the first activity.
- You can update all salvegenskaper in the plan at the start of the program. However, it may take quite some time if the plan is great.
- Information on the work order improved.
- The first charge can take data from the first drilling and others can take information from others. Garpenberg use it to print on stope width and breadth of the district ointment.
- Blast properties going to post.
- The event's properties can be put.
- The program can only start once a plan. If you try to read the plan again get an error.
- When to report an activity that has messages, you can move messages from the next subtask, ointment or end.
- There is a setting for activities to be added to the reported automatically when you open the report window.
- There is a setting for activities to be pushed to now when you start them.
- It gets fatter lines on the printout of gantt views.