V3.0.34 2015-03-30

  • ABB Optimization
    • New resource properties, Priority, Autoscheduled
    • Importing file older than 5 minutes give warning.
  • Settings for Resources remade.
  • Personnel can be assigned to activities. Maximum of 3 workers per task.
    • You define the shift crew under tools/manage/personnel.
    • Assigning personnel appear on the context menu on activity.
    • Personnel is shown in the Activity toolbar. Configuration is required.
    • Personnel is shown in report form. Configuration is required.
  • Work order can be printed for personnel.
  • Corrected error when updating balance in remuck locations when reporting loading/cleanup.
  • The state of show messages are stored so that you do not need to turn it on/off at startup.
  • The system that created the task is saved.
    • GanttScheduler, MineInsight, autoplanering, ABB, ABB hoist Minemap and Deswik.
  • Fixed undo. Reported times was changed if you undid the remove heading from plan.
  • Activity types can be inactivated.
  • When reporting ongoing activities, the remaining length set to (length of activity before break minus reported length) instead of the standard length.
  • Import round to stope in stope properties (Tara)
    • Matching level requirement removed.
    • Level is shown in the grid instead.