Skillnad mellan versioner av "Translations:SIDO Administration/26/en"

Från DataPolarna
Hoppa till: navigering, sök
Rad 13: Rad 13:
 
<br />
 
<br />
 
The assignment is completed and signed at 10:00
 
The assignment is completed and signed at 10:00
<br />
+
<br />  
 
A new assignment is created that will be activated 23 february at 10:00 (calculated one day from endtime).
 
A new assignment is created that will be activated 23 february at 10:00 (calculated one day from endtime).
 
|}
 
|}

Versionen från 8 mars 2016 kl. 07.06

Information om meddelandet (bidra)
Det här meddelandet har ingen dokumentation. Om du vet var eller hur detta meddelande används, så kan du hjälpa andra översättare genom att skriva dokumentation för meddelandet.
Definition av meddelandet (SIDO Administration)
{| style="background:transparent;"
| style="width:320px; vertical-align:top; border:0px; padding: .5em 1.5em;" |
[[Fil:Exempel2.png|300px|thumb|left]] 
| style="width:auto; vertical-align:top; border:0px solid #aaa; padding: .5em 1.5em;" |
'''Exempel 2 – Schemalagd från sluttid'''
* Schemalagt uppdrag med första start 2016-02-22 08:00. 
* Intervall är satt till 1 dag och Utförs inom är satt till 4 timmar. 
* Inget Arbetsschema är valt
* Uppdraget beräknas från sluttid
* Uppdrag ska endast skapas om föregående uppdrag är avslutat.
I detta fall kommer uppdragsknappen på uppdragsskärmen bli aktiv den 22 februari klockan 08:00. <br/>
Uppdraget utförs och kvitteras klockan 10:00. <br/>
Ett nytt uppdrag skapas som blir tillgängligt den 23 februari klockan 10:00 (beräkning 1 dag från sluttid).
|}
Översättning{| style="background:transparent;"
| style="width:320px; vertical-align:top; border:0px; padding: .5em 1.5em;" |
[[Fil:Exempel2.png|300px|thumb|left]] 
| style="width:auto; vertical-align:top; border:0px solid #aaa; padding: .5em 1.5em;" |
'''Example 2 – Scheduled from endtime'''
# Scheduled assignment with first start 22/02/2016 08:00.
# Interval is 1 day and Carried out within is 4 hours.
# No workschedule is selected.
# The assignment is calculated from endtime.
# New assignment should only be created if previous assignment is completed.

In this case, the assignment button on the assignment display will become active 22 february at 08:00.
<br />
The assignment is completed and signed at 10:00
<br /> 
A new assignment is created that will be activated 23 february at 10:00 (calculated one day from endtime).
|}
Exempel2.png

Example 2 – Scheduled from endtime

  1. Scheduled assignment with first start 22/02/2016 08:00.
  2. Interval is 1 day and Carried out within is 4 hours.
  3. No workschedule is selected.
  4. The assignment is calculated from endtime.
  5. New assignment should only be created if previous assignment is completed.

In this case, the assignment button on the assignment display will become active 22 february at 08:00.
The assignment is completed and signed at 10:00
A new assignment is created that will be activated 23 february at 10:00 (calculated one day from endtime).