GanttScheduler changelog

Från DataPolarna
Version från den 7 mars 2016 kl. 09.52 av Andersk (Diskussion | bidrag) (Skapade sidan med '== V1.45 2013-09-01 == * Faults reported by first selecting the group then cause. One can choose the cause directly if you want to do that before. * There is a function that...')

Hoppa till: navigering, sök
Andra språk:
English • ‎svenska

V3.0.45 2015-12-08

  • Inactive delay causes and machines will not appear in the program.
  • You can view messages as tooltip. Setting is required.
    • In the File / Preferences.
    • For each ganttview showing messages.
    • During sequential manner Show hint about to "true".
    • During info text and check "Show hint".
  • Work order, the previous activity is shown when it ends exactly at the same time as the next start.
  • Resources can be set up so that they do not show location messages that neither has activity type nor resource group.
    • The setting is in the Tools / Manage / Manage activity types and resources.
    • The setting is located on each resource and is called "View generic place messages".
  • Comment requirement for extra activities is configurable. This setting is found under Tools / Preferences and is called "Comments must be reported for extra activities."
  • Rep orted activities shown at the exact recorded time, regardless of schedule.
    • Moving activities and the push feature use schedule.
    • If you want an activity outside the schedule, you can hold down Alt while moving it.
    • Press and hold down shift if you want to move, rather than extend it when the activity is small.
    • The requirement to hold down alt when you extend an activity is removed.
  • You can change the shift schedule on several activities at a time.
  • You can mark messages as important. Messages will then be printed on all work orders whether they belong to the place or not.
  • Paste fill and waste rock fill is available in stope properties.
  • Tons including waste dilution is used in stope properties.
  • Dynamic capacity can be used in length formulas.
  • When reporting loading a check box "Full" is available, if you check it then the capacity of the re-muck bay is adjusted to its content.
    • The activities function under Tools / Options in the check box "Report destination is filled".

V3.0.44 2015-11-19

  • Fixed push issue
  • Corrected so that inactive delay causes does not appear.
  • Corrected work order, previous activity wasn’t shown if it finished exactly at the same time as the new activity started.
  • Change shift schedule on several tasks at a time

V3.0.43 2015-10-19

  • Stope functionality
    • Right click and select stope properties.
    • Workload for cable bolt, drilling, loading, mucking and grout is available.
    • Planned values for a period can be input.
    • Activity length can be adjusted to remaining workload. Formulas for this is configured under manage length formulas.
    • Length formula i.e. ([BLASTDRILLMETERS]-[SUM(Långhålsborrning.Antal meter)])/200
  • Choose destinations for a heading.
    • Destinations can be shown in a heading tab.
  • Auto scheduling
    • Links are exported to file Links.csv.
    • New field for effective length.
    • Use in optimization can be checked for each heading.
  • Optimizations
    • Database writes are handled in on operation per activity instead of many.
    • Count of overlaps improved.
  • Field formulas can be set for any field. Available under manage length formulas.
    • I.e. to define a default value.

Field = ACTIVITYCONCRETEPART Condition = ([ACTIVITY]=STIB-fyll)&&([ACTIVITYCONCRETEPART]=) Formula = 8

  • Deswik
    • Solved issue import activities when adding heading to plan.
  • Filter field on tab only initialized once.
  • Application utilization can be logged to file.
    • Event Tab. Log to file. A folder called Log is created in the same folder as the executable.

V3.0.42 2015-09-09 (Tara)

  • Setting for recorded values whether or not is should be summed.

V3.0.41 2015-08-19 (Tara)

  • Solved issue so all activities are read on headings without rounds.

V3.0.40 2015-05-28

  • Section can be assigned to a crew in the application. The sections that has at least one crew with a schedule will appear on the shiftreport on GSWeb.
  • Updated ABB auto scheduler to latest version.

V3.0.39 2015-05-20

  • Solved bug in manage activity cycles. Bug caused the application to remove activity cycles instead of saving the changes.

V3.0.38 2015-05-11

  • Heading can be grouped in order to prevent concurrent activities. Activity time on one heading will be colored red on the other headings within the same group. (oracle version)
  • Updated ABB auto scheduler to latest version.
  • Solved update of balance on remuck stations for trucking activities in Tara.

V3.0.37 2015-05-07

  • Equipment can be member in multiple resource groups.

V3.0.36 2015-04-27

  • Corrected one more issue when updating balance in remuck locations when reporting loading/cleanup.
  • Solved issue with saving personnel when removing all personnel from an activity.

V3.0.35 2015-04-14

  • Planned values can be printed on work order.
    • Open manage activity types and resources / Select activity type / Information text.
    • Create new row, right click on the empty row and choose activity, report value and planned.

V3.0.34 2015-03-30

  • ABB Optimization
    • New resource properties, Priority, Autoscheduled
    • Importing file older than 5 minutes give warning.
  • Settings for Resources remade.
  • Personnel can be assigned to activities. Maximum of 3 workers per task.
    • You define the shift crew under tools/manage/personnel.
    • Assigning personnel appear on the context menu on activity.
    • Personnel is shown in the Activity toolbar. Configuration is required.
    • Personnel is shown in report form. Configuration is required.
  • Work order can be printed for personnel.
  • Corrected error when updating balance in remuck locations when reporting loading/cleanup.
  • The state of show messages are stored so that you do not need to turn it on/off at startup.
  • The system that created the task is saved.
    • GanttScheduler, MineInsight, autoplanering, ABB, ABB hoist Minemap and Deswik.
  • Fixed undo. Reported times was changed if you undid the remove heading from plan.
  • Activity types can be inactivated.
  • When reporting ongoing activities, the remaining length set to (length of activity before break minus reported length) instead of the standard length.
  • Import round to stope in stope properties (Tara)
    • Matching level requirement removed.
    • Level is shown in the grid instead.

V3.0.33 2015-03-10

  • Changed icon and added hourglass on export to MineInsight button.

V3.0.32 2015-03-06

  • Edit condition for assignment of automatic blast cycle corrected.
  • Remove activity from blast cycle definition corrected.

V3.0.32 2015-03-05

  • Work order page format reverted to A4 landscape.
  • Export to MineInsight button under tools.
    • Activate the feature under Tools / Settings / Mine Insight.
  • Settings form uses tab control.

V3.0.31 2015-02-25

  • ABB optimization, solved reload activities error which happened during apply result.

V3.0.30 2015-02-20

  • Solved issue with opening report form after change of report settings.

V3.0.29 2015-02-16

  • ABB optimize plan corrections.
    • Close application disabled while optimize is running
    • Warnings from optimize handled.
    • Invalid machines and activities gives warnings.
  • Merge activity feature created.
  • Report value kind can be set in manage/report values.
  • Only changed fields will be updated in the database.
  • Activity end time will remain the same after report of ongoing activity.
  • Error message will be displayed if database connection fails at startup.
  • Shift schedule name can now contain any characters.
  • Application will default to primary screen if the previous position is outside of desktop.

V3.0.28 2015-02-06

  • Solved push of activities that is placed within wait time.
  • Create rounds on stopes from blast tonnes table.
  • Shift boss field will be cleared on the new activity when reporting ongoing activities.

V3.0.27 2015-01-16

  • Activities and resources will not be deselected on canceled drag n drop.

V3.0.26 2015-01-02

  • Arrowhead is always shown on links.
  • Solved issue with reporting next activity for equipment.
  • Solved issue with save filter.
  • Solved issue with crash during startup caused by link.

V3.0.25 2014-12-11 (Tara)

  • Push on destinations and backfill tab fixed.
  • Read of columns from daily geology heading status.
    • DGR_Ore_Wst, DGR_Grade, DGR_Rock_Type, DGR_Update_Date is now available

V3.0.24 2014-12-10

  • Solved issue with blast properties form not displaying controls.

V3.0.23 2014-12-09 (Tara)

  • Solved sum ton in activity report form
  • Default section set automatically during creation in development, stopes and backfill.
  • All active destination will now be show after start/reload.
  • Solved issue with editing delay causes.
  • Translations Swedish to English made
  • Manage capacities will now be back in the menu Tools/Manage.
  • Stope properties that is set while creating stope will be stored correctly.
  • Backfill context menu will now show the correct items.
  • Issue with set activity cycle on backfill fixed.

V3.0.22 2014-12-03

  • Solved issue with compare plan during startup.

V3.0.21 2014-12-01

  • Manage activity types and resources. Properties rewritten on activity types and activity cycles.
  • Equipment popup menu on activities rewritten to make it faster.
  • Resolved create link so it doesn’t crash.
  • Links can be created between activities and rounds. Settings need to be changed after install.
  • Activities can be set up to ignore wait time. I.e. after shotcrete.
  • Solved issue with toolbar so that it will show up after start.
  • Activity times will be shown on work order when you check “Show activity times in workorder” With the option unchecked and it will show shift names instead.
  • Messages can be set to an activity type or resource group.
  • You can change an activity length without zooming.

Previously Alt + Left mouse button did not work. This is resolved.

  • Translations made.

V3.0.20 2014-10-30

  • At report of mucking previous used destinations will be shown on top of the other destinations. Configuration needed after install. Swedish version only.
  • Clicking Apply and then OK while reporting ongoing activities will now only create one extra activity.
  • Destination properties issue solved.
  • Filter of Gantt views changed. Right click on the tab and select Show filter. Enter the filter text string for quick filtering. Use semicolon to separate multiple filter strings.
  • Improved speed of gantt views generation/filtering.
  • Resolved issue that caused views to generate twice at startup.
  • Resolved issue that made application local settings to not load at startup.
  • F5 for reload of plan restored.

V3.0.19 2014-10-20 Swe/Tara

  • Current location for equipment can be shown under the equipment tab.

Configuration of location expression needed.

  • Activity toolbar is now scrollable with the mouse wheel when needed.
  • Publish plan is changed so it is now possible to publish plans with full week start and finish. This is default for monthly plans. (Swe).
  • It is possible to split an activity by right clicking on the activity and select “Split activity”. (Swe)

Usable when i.e. extra cleaning is needed. Drill meters, tonnage and volume is divided percentually if it is set.

  • Solved an issue for manually created rounds. Improves sync between Minemap and Gantt.
  • Ground support class is shown for headings. (Tara)
  • Selected sections will be remembered in select plan form. (Tara)
  • Parking place field is increased in work order.

V3.0.18 2014-10-02 Swe/Tara

  • Solved selection issue that made the move activity hint not disappear after an activity move. After the activity move hint got stuck, GanttScheduler stopped receive reload messages from the message handler application.

V3.0.17 2014-09-16 Swe

  • ABB optimization of plan.

New features:

    • Definition of crew.
    • Definition of crew schedule.
    • Definition of crew competence.
    • Definition of personnel absence and personnel change in crews.
    • Run optimization.
    • Accept proposed optimization result.
    • Delete proposed optimization result.
    • Undo optimization.
  • Reminder of save shift plan for bottleneck report available in bottleneck settings

V3.0.16 2014-09-03 Tara

  • In order to read all headings at start/refresh the sections list is populated from the sections logged into MIST during last 2 weeks instead of only the current shift.

V3.0.15 2014-08-25 Tara

  • Sections instead of crews.
  • Removed default shift crews shown for each shift boss
  • Changed Current Unix X to the actual shift boss crew recorded in MIST.
  • During plan select you can select which shift to get attendance from.
    • Default is the last recorded shift in MIST

V3.0.14 2014-08-21 Swe

  • Fixed calculation of ton in blast properties.
    • Group = 'Inslagsfällning' or 'Rumsfällning'

ton = tonnage*(0.4+gråbergpåslag/100)-tonnage*malmförlust/100

    • Other group

ton = tonnage*(1+gråbergpåslag/100)-tonnage*malmförlust/100

V3.0.13 2014-08-20 Swe

  • Fixed empty destination feature in report activity.

V3.0.12 2014-08-18 Swe/Tara

  • Fixed automatic adjustment of delay length
    • Activities width (Machine not available=Yes) will not adjust delays
    • Delay length was calculated incorrect if delay start wasn’t equal to activity end.
  • Fixed work order so text prints on multiple rows if it is to long.
  • Fixed crash caused by the push feature during refresh/reload of plan.
  • Fixed mouse wheel in toolbar.
  • Change log also in English.

V3.0.11 2014-06-04 Swe

  • You can check the "Always use this" in the dialog boxes that ask questions. Then the program will not show the dialog slightly more and always answer it was pressed.
    • Under Tools / Manage / Standard Options, you can set what will be answered automatically
  • Pause heading
    • You can pause / restart a heading. This starts / ends activity paused at the end.
  • Move the heading to rehab / View heading during rehab
    • You can have a tab that displays panels that need rehab or have active rehab.
  • TOC new button to save shift plan
  • Location Types
    • You can specify the type of destination in destinations
    • Edit destination types in Tools / Manage / Destination Types
  • Rereading improved
  • Work equipment choices grouped by machine type
  • Disturbances can have two finishes for a time machine back up and running and one for when the end comes up again.
    • Under Tools / Manage / Settings can be set to interference must be corrected to the next activity automatically when prolonged disturbance times until you start the next activity on the machine / heading.
  • You can specify whether the new activities will be added as extra activities or not. Setup found under Tools / Manage / Settings.

V3.0.7-9 2014-05 Tara

  • Tara changes

V3.0.6 2014-04-07

  • Added the new calculation type for TOC
    • Previous activity to bottleneck activity
  • Quit draw the arrows where the buffer count
  • Corrected refresh feature so that it doesn’t crash

V3.0.5 2014-04-07

  • TOC Renstrom.
  • Changed calculation of bottleneck
  • You can save bottleneck plan ointments not started.
    • Select an ointment and press "Save TOC plan" to save on plane for an ointment
    • Select a heading and press "Save TOC plan" to save on plane for all ointments on a heading
    • During tool is a button to save the TOC for all planned ointments.
  • Crash when highlighting activity rectified. Happened after you removed an activity.
  • Settings for the bottleneck is under tools / manage / handle bottleneck. Where you set the colors and the bottleneck activity to be monitored.

V3.0.4 2014-03-27

  • Facelift tara corrections.

V3.0.3 2014-03-19

  • Fixed pushed so that shotcreting -> cleaning not become a problem.
  • Bottleneck improved so that it is possible to see the indicator on the end
  • Enclosed tabs can be set.
    • If you change active upper flap so you can automatically get a different active at lower and vice versa. Settings / linked tabs.
  • Tara version with facelift.

V3.0.2 2014-02-28

  • Check boxes on the time chart rectified.

V3.0.1 2014-02-27

  • Move completed activity rectified.
  • View this message corrected
  • Set resource rectified
  • Step status available in the menus
  • Nudging rectified
  • Move message when reporting rectified
  • Cancel the way status rectified.
  • Timing diagrams in settings fixed.

V3.0 Beta2 2014-02-14

  • Be able to state whether the times are estimated with a check box
  • Quick Tools menu beside activities
  • Functions of the bottleneck
  • Corrections in the menu so that it hopefully does not crash

V3.0 Beta 2014-01-16

  • New database manager
    • BDE needed no more
  • New toolbar
  • New color management
    • Color activities is controlled by the base type.

Do they have the same base type to get all the same color.

  • Communication program is installed in the same folder as GanttScheduler.
  • Crystal Report Viewer installed in the same folder as GanttScheduler.

V1.48 2013-10-21

  • Change salvtempo done on all selected ointments. Although they are at different ends.
  • You can set a minimum time for change salvtempo so salvobjekten becomes longer.

V1.47 2013-09-30

  • Change name of some buttons in message handling so that it becomes easier to understand. (Deleted instead of signed).

V1.46 2013-09-24

  • You can load activities on a volley by right clicking on it and selecting read activities.
  • Corrected bug that made that one had to specify values when it reported a break
  • Corrected bug that caused interference in the cause was saved if you used the cancel for the right click of the activity.
  • When reports so the program will now update the previous delaktivitets interruptions so that they go from the event's end to the next activity starts. If noise is a part of the previous activity so they do not change.

V1.45 2013-09-01

  • Faults reported by first selecting the group then cause. One can choose the cause directly if you want to do that before.
  • There is a function that checks for updates of the program. Upgrades are added to the database (not ready yet).

V1.44 2013-07-01

  • Man kan mata in ton i rapportformuläret för lastning. Detta kräver anger en formel för beräkning av ton utifrån lass och kvalitet.
  • Transport av material kan spåras från ursprungsdestination till slutdestination, en blandhalt beräknas om man lastar från flera salvor till ett och samma upplag. Data lagras i tabellerna GSDestinationBatch och GSDestinationBatchContent.
  • Man måste numera använda publicera plan då man gör nya planer. Detta så att alla gruvor använder programmet på samma så att samma rapporter ska fungera på alla gruvor.
  • Meddelanden går ta bort direkt i ganttscheduler genom att högerklicka på den gula raden under gaveln och välja ”Signera och ta bort meddelande”.
  • Det går sätta en egen färg på en gavel.
  • Det går tilldela aktivitetscykel automatiskt utifrån salvegenskaper. Man gör formler för detta i redigera/aktivitetstyper och resurser. Under fliken salvcykler så lägger man upp rader för automatisk tilldelning av salvcykler. Sen kan man välja tilldela automatiskt då man högerklickar på en salva.
  • Man kan ange gaveltyp på en gavel. Högerklicka på gaveln och välj ändra gaveltyp. Fältet som modifieras är FACETYPE. Kristineberg och Garpenberg använder det till att ange vilket skiftlag som ska hantera gaveln.
  • Storskalig brytning. Aktiviteter kan ha ton, volym och borrmeter. De tilldelas utifrån en formel på aktivitetstypen eller aktivitetscykeln. Om man rapporterar in en del av en aktivitet så ska den nya delen skapas med resterande tid för den storskaliga operationen. En längdformel krävs som returnerar den återstående tiden i dygn kvar.
  • Destinationer kan namnges då man redigerar deras saldo.
  • Man kan flytta pågående/rapporterade aktiviteter. Man får en fråga som man måste bekräfta för att den ska flyttas.
  • Plan att jämföra kan läsas in direkt vid start av programmet.
  • Man kan lägga upp användarnamn på de som kör på en gemensam dator. Nya meddelanden knyts till namnet man valt vid start.
  • Gavlar som är borttagna ur Minemap tas bort ur GanttScheduler planen då man trycker på ”+” knappen för att lägga till nya gavlar. Gavlar som är startade och har rapporterade aktiviteter tas inte bort ur planen, dessa kan tyvärr göra att det inte går lägga till en ny gavel som heter exakt lika som den borttagna.
  • Man får en fråga om man vill starta en salva då man startar/rapporterar första aktiviteten.
  • Man kan uppdatera alla salvegenskaper i planen vid start av programmet. Det kan dock ta ganska lång tid om planen är stor.
  • Information på arbetsordern förbättrad.
    • Första laddningen kan ta data från första salvborrningen och andra kan ta information från andra. Garpenberg använder det för att skriva ut bredd på stross och bredd på ortsalva.
    • Salvegenskaper går att lägga in.
    • Aktivitetens egenskaper går att lägga in.
  • Programmet går bara starta en gång för en plan. Om man försöker läsa in planen igen får man ett fel.
  • Då man rapportera en aktivitet som har meddelanden så kan man flytta meddelanden från den till nästa delaktivitet, salva eller gavel.
  • Det finns en inställning för att aktiviteter ska sättas till rapporterad automatiskt då man öppnar rapportfönstret.
  • Det finns en inställning för att aktiviteter ska flyttas till nulinjen då man startar dem.
  • Det blir fetare streck på utskriften av ganttvyer.

V1.43 2013-02-21

  • En streckad linje visas igen mellan påbörjade aktiviteter och nästa aktivitet på arbetsordern.

V1.42 2013-02-08

  • Inrapportering av tid på efterförstärkningsdelen på aktiviteter.

V1.41 2013-02-06

  • Rättat arbetsorder så att den visar aktivitetsmeddelanden korrekt.
  • Rättat arbetsorder så att den visar föregående aktiviteters rapporterade värden korrekt.

V1.40 2013-01-29

  • Arbetsorder
    • Om man kryssat i ”visa tider i rapport” så visas tiderna.
    • Datum då meddelande skapades visas.
    • Om man har fler än 5 gavel- och resurs-meddelanden så visas de med mindre text.
  • Publicering
    • Valet ”Enbart export till Bolis” finns som val vid publicering av plan. Man väljer publiceringsmetod då man publicerar.
    • En ny begränsning har lagts till så att det är bara den sista publicerade planen av varje typ som går att ersätta.
  • Svenska väljs som språk om man inte valt språk någon gång. Förut blev det en blandning av svenska och engelska i programmet.

V1.39 2013-01-22

  • Visa i rapport går ställa in på maskinerna. Vissa rapporter bland annat Resursutnyttjande och Störningsrapporterna använder inställningen för att inte visa alla maskiner.
  • Aktivitetsverktygsfältet tar mer höjd istället för att man ska pila till vänster och höger då inte alla aktivitetsknappar ryms.
  • Rättat funktionen för att läsa och visa rapporterade värden i tabell. Man läser in data i fliken rapporterat.
  • Om kontakt med databas bryts så kommer en återanslut dialog att visas. Förut var man tvungen att starta om programmet.

V1.38 2013-01-07

  • Rättade ett fel (GSSESSIONLOG_UK1).
  • Inställningen för spara automatiskt går nu inte ändra. Den är alltid påslagen.

V1.37 2013-01-02

  • Rättade fel i publicering. Ersätter planen efter en fråga precis som förut.

V1.36 2012-12-17

  • Sökning i GanttScheduler.
    • Tryck Ctrl+F för att söka i en ganttvy eller tabell. Skriv ett sökord.
    • Första träffen markeras sen så kan man klicka nästa eller föregående för att söka vidare.
    • Knappen ”A” markerar alla träffar.
  • Man kan ställa in vilka aktiviteter som måste finnas under skiftet för att en maskins arbetsorder ska skrivas ut.
    • Redigera aktivietstyper och resurser. Under aktiviteter ändra fältet skiftaktivitet till ”Ja” på de önskade aktiviteterna.
    • Default är de som nu ingår i en salvcykel.
  • Det går spara en sortering på gavlar så att man kan återställa den ifall den förändras eller om man vill ha flera olika sorteringar.
    • Välj ”Ändra ordning på gavlar…” från menyn som kommer då man högerklickar på en gavel.
    • Redigera ordningen genom att markera och dra gavlarna med vänster musknapp eller tryck ”Pil upp”, ”Pil ner”.
    • Tryck spara och ange ett namn på den sortering som du definierat.
    • Välj den sparade sorteringen och tryck ok för att använda den sorteringen.
  • Publicera utkast.
    • Det går markera en plan som utkast då man publicerar. Med utkast så menas att planen inte är klar och man vill kunna skriva ut den som diskussionsunderlag.
  • Starttid och sluttid ska sättas mer korrekt i långtidsplanen då man ändrar status på salvor i Driftplanen. Både den automatiska ändringen samt uppdatera salvegenskaper är korrigerade.
  • Rättat bugg för att dra lös en flik och lägga den i separat fönster.

V1.35 2012-11-29

  • Då man ändrar status på aktiviteter/salvor så får man en fråga om att även sätta status på salvan/gaveln enligt vad den borde ha.
    • Om allt på salvan/gaveln är avslutat så kommer frågan om att ändra salvan/gaveln till avslutad
    • Om något på salvan/gaveln är aktivt eller avslutat så kommer frågan om att ändra salvan/gaveln till aktiv.
  • Man kan se vilka som jobbar i programmet via meny Redigera/Visa aktiva sessioner.
    • Då man startar programmet och någon har planen öppen i redigeringsläge så visas en varning och man får starta det i endast läsning eller redigera samtidigt.
  • Dubbelbokningar visas på en knapp i verktygsfältet. Om man trycker på knappen så markerar programmet den senare av de två aktiviteterna som är överlappande.

V1.34 2012-11-20

  • Rättat ett fel i arbetsordern, data togs från fel aktivitet om flera aktiviteter av samma typ fanns på samma salva.

V1.33 2012-11-15

  • Inställningsbart vad som visas på arbetsordern
    • Ställ in det under Redigera/Hantera Aktivitetstyper och Resurser, under varje aktivitetstyp så kan man skriva informationsrader och fylla i egenskaper genom att högerklicka.
  • Start, slut och status visas inte på arbetsordern.
  • Aktiv flik får en tydligare färg.
  • Schema visas på tidsaxeln. Det går slå av och på via menyn Visa/Tidsaxel/Visa schema på tidsaxel.

V1.32 2012-10-11

  • Skiftschema sätts på man skapade extra aktiviteter.
  • Det går förlänga en aktiv salva då alla aktiviteter rapporterats in.

V1.31 2012-09-25

  • Åtgärdat crash i gavelegenskaper.
  • Då man dubbelklickar på en aktivitet så öppnas olika formulär beroende på plantyp
    • Plantyp utfall öppnar inrapportering
    • Annan plantyp öppnar aktivitetsegenskaper
  • Filtrering förbättrad
    • Det finns två nya kolumner som heter STARTTIME och ENDTIME de innehåller tider oberoende om de är tider från en salva eller aktivitet. På så sätt så kan man filtrera fram det som enbart ska ske i år.
    • Man kan sätta en grupp i filtrering. Om något i gruppen matchar filtret så kommer allt i gruppen att bli synligt. Använd FACEMININGOB JECTID som grupp för att allt data om gaveln ska komma med. Dvs alla salvor + alla gavelaktiviter kommer att visas.

V1.30 2012-09-17

  • Rättat ett fel som gjorde att gavlar inte blev synliga trots att man lagt in dem i planen.

V1.29 2012-08-29

  • Rättat beräkning av länkar mellan salvor
  • Omarbete (extra aktiviteter) och efterförstärking (Kriberg) visas i rapportformuläret.
  • Kvalitet sätts på alla salvor då man skapar salvor. (Kankberg)
  • Det går flytta aktiva salvor om de saknar aktiviteter.

V1.28 2012-08-17

  • Länkning mellan salvor
    • Använd länkverktyget och rita en länk från en salva som måste brytas före till den salva som ska brytas efter. Man ska bara skapa länkar mellan olika gavlar.
    • Man kan skapa länkar genom att markera två salvor och högerklicka och välja skapa länk.
    • Håll ned ctrl och klicka på salvor för att markera flera.
    • Flytta efter salvor genom att beräkna om planen med knappen som ser ut som en miniräknare.
    • Ta bort en länk genom att högerklicka på den och välj ta bort.
  • Beräkning av längd på t.ex. fyll aktiviteter
    • Skapa en längdformel i hantera längdformler enligt
    • Villkor: [ACTIVITY]=Sandfyll
    • Längdformel: [ACTIVITYTONNAGE]/500
    • Redigera fyllaktiviteters tonnage i egenskaper för aktiviteten då ska längd beräknas.
  • Låsa aktiviteter från att flyttas av knuff m.m.
    • Högerklicka på aktiviteten och välj ”Lås för flyttning”
  • Övriga buggrättningar

V1.27 2012-05-09

  • Åtgärdat en bugg som gjorde att salvor/aktiviteter inte gick flytta.
  • Skapat ett verktyg för att justera salvstart och salvslut enligt aktiviteterna.
  • Val av maskingrupp förhindrar nu att man drar fel kombination av aktivitet och maskin.
  • Kontroll av att å, ä och ö fungerar emot databasen då man startar.