Translations:GanttScheduler Ändringshistorik/28/en
Från DataPolarna
Version från den 7 mars 2016 kl. 09.50 av Andersk (Diskussion | bidrag) (Skapade sidan med '== V3.0.19 2014-10-20 Swe/Tara == * Current location for equipment can be shown under the equipment tab. Configuration of location expression needed. * Activity toolbar is now...')
V3.0.19 2014-10-20 Swe/Tara
- Current location for equipment can be shown under the equipment tab.
Configuration of location expression needed.
- Activity toolbar is now scrollable with the mouse wheel when needed.
- Publish plan is changed so it is now possible to publish plans with full week start and finish. This is default for monthly plans. (Swe).
- It is possible to split an activity by right clicking on the activity and select “Split activity”. (Swe)
Usable when i.e. extra cleaning is needed. Drill meters, tonnage and volume is divided percentually if it is set.
- Solved an issue for manually created rounds. Improves sync between Minemap and Gantt.
- Ground support class is shown for headings. (Tara)
- Selected sections will be remembered in select plan form. (Tara)
- Parking place field is increased in work order.