Translations:GanttScheduler Ändringshistorik/3/en
Från DataPolarna
Version från den 7 mars 2016 kl. 09.47 av Andersk (Diskussion | bidrag) (Skapade sidan med '== V3.0.43 2015-10-19 == * Stope functionality ** Right click and select stope properties. ** Workload for cable bolt, drilling, loading, mucking and grout is available. ** Pl...')
V3.0.43 2015-10-19
- Stope functionality
- Right click and select stope properties.
- Workload for cable bolt, drilling, loading, mucking and grout is available.
- Planned values for a period can be input.
- Activity length can be adjusted to remaining workload. Formulas for this is configured under manage length formulas.
- Length formula i.e. ([BLASTDRILLMETERS]-[SUM(Långhålsborrning.Antal meter)])/200
- Choose destinations for a heading.
- Destinations can be shown in a heading tab.
- Auto scheduling
- Links are exported to file Links.csv.
- New field for effective length.
- Use in optimization can be checked for each heading.
- Optimizations
- Database writes are handled in on operation per activity instead of many.
- Count of overlaps improved.
- Field formulas can be set for any field. Available under manage length formulas.
- I.e. to define a default value.
Field = ACTIVITYCONCRETEPART Condition = ([ACTIVITY]=STIB-fyll)&&([ACTIVITYCONCRETEPART]=) Formula = 8
- Deswik
- Solved issue import activities when adding heading to plan.
- Filter field on tab only initialized once.
- Application utilization can be logged to file.
- Event Tab. Log to file. A folder called Log is created in the same folder as the executable.