V3.0.43 2015-10-19

  • Stope functionality
    • Right click and select stope properties.
    • Workload for cable bolt, drilling, loading, mucking and grout is available.
    • Planned values for a period can be input.
    • Activity length can be adjusted to remaining workload. Formulas for this is configured under manage length formulas.
    • Length formula i.e. ([BLASTDRILLMETERS]-[SUM(Långhålsborrning.Antal meter)])/200
  • Choose destinations for a heading.
    • Destinations can be shown in a heading tab.
  • Auto scheduling
    • Links are exported to file Links.csv.
    • New field for effective length.
    • Use in optimization can be checked for each heading.
  • Optimizations
    • Database writes are handled in on operation per activity instead of many.
    • Count of overlaps improved.
  • Field formulas can be set for any field. Available under manage length formulas.
    • I.e. to define a default value.

Field = ACTIVITYCONCRETEPART Condition = ([ACTIVITY]=STIB-fyll)&&([ACTIVITYCONCRETEPART]=) Formula = 8

  • Deswik
    • Solved issue import activities when adding heading to plan.
  • Filter field on tab only initialized once.
  • Application utilization can be logged to file.
    • Event Tab. Log to file. A folder called Log is created in the same folder as the executable.